Mittler Bros Machine & Tool AccuLign User Manual
Accu-lign operating manual, Set up, Water level manifold construction
![background image](/manuals/463126/1/background.png)
Accu-Lign Operating Manual
Caution: Read and understand these instructions before using this tool.
Set Up
1. Remove Accu-lign from packaging.
2. Unlock all 8 wheel brakes
Water Level Manifold Construction
To minimize shipping costs and complexity, fabrication of a simple water level
manifold is left to the customer. Instructions follow:
1. At your local home center purchase the following:
1. 10’ of 1” OD PVC plastic pipe
2. 1 PVC 1” Tee (Figure 1 Letter A)
3. 1 PVC 1” Cross (Figure 1 Letter B)
4. 4 adapters – Tee or Cross to ½” NPTF (Figure 1 Letter C)
5. 1 adapter- 1” PVC to ¾” NPTF (Figure 1 Letter D)
6. 4 barb fittings- ½” NPTF to 3/8” ID tubing (Figure 1 Letter E)
7. 1 barb fitting- ¾’ NPTF to ¾” ID tubing (Figure 1 Letter F)
8. 16’ of clear 5/8” OD, 3/8” ID vinyl tubing, to be cut into 4 equal pieces
9. 4’ of clear 1”OD, ¾” ID vinyl tubing to mate with gas can reservoir snout
and barb fitting
10. 1 gallon plastic fuel can with pour snout and vent feature or similar
reservoir with at least 50 in^2 water surface area exposed to atmosphere
11. 1 small can PVC cement
2. Cut the 1” OD PVC tubing to the length of the wheelbase of the cars you will be
aligning. Assemble and glue the tee, cross, adapters, barb fittings as shown in the
photo. Consider adding additional fittings mid length to ease trailer storage. (as
shown)
Figure 1
E
B
A
C
F
D