beautypg.com

Preventive maintenance, General comments, Maintenance schedule – Goulds Pumps 3420 - IOM User Manual

Page 37

background image

PREVENTIVE MAINTENANCE

GENERAL COMMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
MAINTENANCE SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
MAINTENANCE OF BEARINGS . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Oil Lubricated Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Grease Lubricated Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Bearing Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

MAINTENANCE OF SHAFT SEALS . . . . . . . . . . . . . . . . . . . . . . . . 37

Mechanical Seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Packed Stuffing Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

TROUBLE SHOOTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38

GENERAL COMMENTS

A routine maintenance program can extend the life of your pump. Well maintained equipment

will last longer and require fewer repairs. You should keep maintenance records. This will help pinpoint
potential causes of problems.

!

The preventive maintenance section must be adhered to in order to keep the applicable ATEX classification of the
equipment. Failure to follow these procedures will void the ATEX classification for the equipment.

MAINTENANCE SCHEDULE

INSPECTION INTERVALS

Inspection intervals should be shortened appropriately if
the pumpage is abrasive and/or corrosive,

!

or if the environment is classified as potentially
explosive.

ROUTINE MAINTENANCE

Bearing lubrication

Seal Monitoring

Vibration Analysis

Discharge Pressure Monitoring

Temperature Monitoring

ROUTINE INSPECTIONS

Check the level and the condition of the oil

Check for unusual noise, vibration, and bearing
temperatures

Inspect the pump and piping for leaks

Check the seal chamber/stuffing box leakage

Mechanical Seal - There should be no leakage.

Packing - Excessive leakage requires adjustment
or possible packing replacement. Refer to sec-
tion 4: Operation, for packing gland adjustment.

3420 IOM 8/09

33

5