Conversion from flood-oil to pure-oil mist, Convert from flood oil to regreaseable, 3198 teflon sleeve – Goulds Pumps 3198 i-FRAME - IOM User Manual
Page 106: Replace the 3198 teflon sleeve, Place the 3198 teflon sleeve

Item Number
Size
Description
Quantity
193
1/4"-18 NPT
Grease fitting
2
228
- - - -
Bearing frame
1
241
- - - -
Frame foot
1
370F
1/2"
Hex cap screw
2
408A
3/8"-18 NPT
External square head pipe
plug (magnetic)
1
408J
1/4"-18 NPT
External hex/square head
pipe plug
1
408L
1/2"-14 NPT
Square countersunk
headless pipe plug
1
408M
1" 11-1/2" NPT
Square countersunk
headless pipe plug
1
529
1/2"
Light helical spring lock
washer
2
Conversion from flood-oil to pure-oil mist
Consult your local ITT representative for further information on this topic.
Convert from flood oil to regreaseable
Consult your local ITT representative for further information on this topic.
3198 Teflon sleeve
Replace the 3198 Teflon sleeve
You can replace the 3198 Teflon sleeve in the field as long as you meet these requirements.
• You have a controlled oven that can heat the sleeve to 550° F (288° C).
• You have a method of machining the sleeve after installation on the shaft.
If you are unable to meet these requirements, you can obtain shaft and sleeve sub-assemblies are available
from ITT.
CAUTION: Do not heat the sleeve with an open flame. Doing so may result in equipment damage.
CAUTION: Be careful when handling the end of the sleeve. Doing so may result in equipment damage.
1. Remove the old or damaged sleeve (126) from the shaft (122).
You can cut the sleeve lengthwise with a sharp knife.
2. Thoroughly clean the shaft and pay particular attention to the knurled area of the shaft under the
sleeve.
The replacement sleeve does not have the same dimensions as the sleeve that you removed until you
mount and then machine it on the shaft.
3. Heat the replacement sleeve in a controlled oven at 550°F (288°C) for 40 minutes.
Maintenance
104
Model 3198 i-FRAME Installation, Operation, and Maintenance Manual