beautypg.com

Start-up procedure, Mt p a – Hawk Industries Hawkjaw Jr. Manual 65K-2GJR Serial Numbers 21 to 32 User Manual

Page 14

background image

Start-up Procedure

1. Connect the air power source with the Air

(A) line.

2. Make sure the hydraulic reservoir is full.
3. Connect the hydraulic Pressure (P), Tank

(T) and Air (A) lines. "P" and "T" Port
Designations are stamped on the Main
Hydraulic Manifold (M). Do not hook up
the hoses backward

4. Check for hydraulic leaks.

Operation

14

NOTE

Tightly connect the hose fittings. A loose
connection causes a pressure drop in the
hydraulic fluid which heats up the fluid and
reduces component life.

Part Numbers

Part Name

Part #

Male Quick Disconnect (P)

061-H52

Female Quick Disconnect (T)

061-H53

Male Air Quick Disc. (A)

061-A12M

Female Air Quick Disc.

061-A12F

M

T

P

A