7. Maintenance

B

EFORE PERFORMING ANY MAINTENANCE REQUIRING REAGENT HEAD OR VALVE

(

WET

END

)

DISASSEMBLY

,

BE SURE TO RELIEVE PRESSURE FROM THE PIPING SYSTEM AND

,

WHERE HAZARDOUS PROCESS MATERIALS ARE INVOLVED

,

RENDER THE PUMP SAFE TO

PERSONNEL AND THE ENVIRONMENT BY CLEANING AND CHEMICALLY NEUTRALIZING AS

APPROPRIATE

. W

EAR PROTECTIVE CLOTHING AND EQUIPMENT AS REQUIRED

.


Accurate records from the early stages of pump operation will indicate the type and levels of
required maintenance. A preventative maintenance program based on such records will minimize
operational problems. It is not possible to forecast the lives of wetted parts such as diaphragms
and check valves. Since corrosion rates and operational conditions affect functional material life,
each metering pump must be considered according to its particular service conditions.

PULSAR Shadow

®

KOPkits contain all replacement parts normally used in a preventative

maintenance program. It is recommended that KOPkits and PULSAlube eccentric and gear oils
be kept available at all times.

7.1 Wet End Removal, Inspection and Reinstallation

I

F THE DIAPHRAGM HAS FAILED

,

PROCESS FLUID MAY HAVE CONTAMINATED THE PUMP

ECCENTRIC OIL

(

ALTHOUGH NORMALLY

,

ANY PROCESS FLUID BEHIND A FAILED

DIAPHRAGM WOULD PASS THROUGH THE BOTTOM DRAIN HOLE

). H

ANDLE WITH

APPROPRIATE CARE

,

CLEAN AND REPLACE OIL IF REQUIRED

.



19