Chapter 2: Installation

46

1. Remove the dust plug from the SFP, as shown in Figure 14.

Figure 14. Removing the Dust Plug from the SFP

2. Connect the fiber optic cable to the SFP port, as shown in Figure 15.

Figure 15. Connecting the Fiber Optic Cable

Powering On the

Switch

To power on the switch, perform the following procedure:

1. Plug the power cord into the AC power connector on the back of the

switch, as shown in Figure 16.