beautypg.com

Figure 13: inserting the sfp, Chapter 2: installation 44 – Allied Telesis AT-FS750/24POE User Manual

Page 44

background image

Chapter 2: Installation

44

4. Slide the SFP transceiver into an SFP slot on the switch, as shown in

Figure 12.

Figure 12. Inserting the SFP

5. Repeat steps 2 through 4 if you are installing another SFP transceiver.

Note

SFP transceivers are dust sensitive. When a fiber optic cable is not
installed, or when you store the SFP, always keep the plug in the
optical bores. When you do remove the plug, keep it for future use.

Note

Unnecessary removal and insertion of an SFP can lead to
premature failure.

For information about cabling for the SFP, consult the documentation
that was shipped with the SFP.

25

CLAS

S 1

LASER PRO

DUCT

SFP

10/100/1000Base-T

26

SFP

10/100/1000Base-T

UPLINK PO

RTS

1100