beautypg.com

3 reboot, Reboot – Allied Telesis AlliedView-EMS 4.0.1 QoS MANAGER User Manual

Page 29

background image



5.2.3 Reboot

This option displays a reboot confirmation dialog box.

Note

- This option is only available if QoS Manager is already connected to a target host.

Upon confirmation, the device will be rebooted. While the Reboot is in progress, a
progress window will be displayed. Once completed, the progress window will close and

the contents of the QoS/CoS Information Window should now be updated with the latest

settings from the device.

5 Menus

AlliedView™-EMS 4.0.1 QoS Manager User’s Guide

Page 29 of 146