beautypg.com

Allied Telesis AT-FS750/24POE User Manual

Page 51

background image

AT-FS750/24POE Fast Ethernet WebSmart Switch Installation Guide

51

3. Verify that the POWER LED is green. If the LED is OFF, refer to

Chapter 3, “Troubleshooting” on page 53.

Note

The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to “Starting a
Management Session” on page 52. Fo
r more information about
staring a remote management session, see the AT-S105
Management Software User’s Guide
.

Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.

E5