beautypg.com

Powering on the switch – Allied Telesis AT-FS750/24POE User Manual

Page 50

background image

Chapter 2: Installation

50

2. Connect the fiber optic cable to the SFP port, as shown in Figure 18.

Figure 18. Connecting the Fiber Optic Cable

Powering On the

Switch

To power on the switch, perform the following procedure:

1. Plug the power cord into the AC power connector on the back of the

switch, as shown in Figure 19.

Figure 19. Plugging in the AC Power Cord

2. Plug the other end of the power cord into a wall outlet.

1725

Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.

E3

100-240V

AC~

50-60Hz

1727