beautypg.com

Quickstart, 1 preparation for use, Preparation for use – Campbell Scientific OBS-3+ and OBS300 Suspended Solids and Turbidity Monitors User Manual

Page 12

background image

OBS-3+ and OBS300 Suspended Solids and Turbidity Monitors

4. Quickstart

4.1 Preparation for Use

1. Bench test the sensor to ensure that it functions properly prior to making

field installations (see Section 7.1, Pre-Deployment Tests).

2.

Calibrate the sensor using suspended solids from the waters that will be

monitored (see Section 8,

Calibration

)

.

3. Refer to Section 7.2, Mounting Considerations, for siting and mounting

options.

4.2 Use SCWin to Program Datalogger and Generate Wiring

Diagram

Short Cut is an easy way to program your datalogger to measure the sensor and

assign datalogger wiring terminals. The following procedure shows using

Short Cut to program the OBS-3+/OBS300.

1. Install Short Cut by clicking on the install file icon. Get the install file

from either

www.campbellsci.com

, the ResourceDVD, or find it in

installations of LoggerNet, PC200W, PC400, or RTDAQ software.

2. The Short Cut installation should place a Short Cut icon on the desktop of

your computer. To open Short Cut, click on this icon.

2