2-26

SECTION 2 – HYDRAULIC SET-UP OF WING LIFT CIRCUIT

4. Retraction of part 1 wing lift cylinders is controlled with a sequencing valve. This step will show

proper plumbing for this part of the wing lift circuit.

– Connect an 18” hose from the left hand end of the manifold block to port #1 on the left hand

sequencing valve.

– Connect another 18” hose from the middle port on the right hand side of the manifold block to

port #3 on the left sequencing valve. This hose will allow draining of the valve.

– Connect a 60” and an 84” hose to the T on port #2 of the left sequencing valve. The 84” hose

will go to right side of the machine. Route hoses to rod end of the front 5 x 36” cylinders.

– Install fitting shown and a 6 JIC(F) x 6 JIC(M) 1/16” restrictor to rod end of each 5 x 36” cylin-

der.

– Connect rod end of rear 5 x 36” cylinders to front cylinders with 70” hoses.

5. Plumbing rod ends of part 2 wing lift cylinders.

– Connect a 228” (252” on 56’-60’) hose to two rear ports on the left hand side of the manifold

block.

– Route these hoses to front 4-1/2 x 16” cylinders on wings along second rank.

– Install a 6 JIC(M) T at the end of these hoses.

– Connect 124” hose on one side of each T. Be sure that 1/16” restrictors are installed with fit-

tings shown.

– Connect 124” hoses to rod end of rear 4-1/2 x 16” cylinders as shown.