Summers Superchisel - 5-Section User Manual
Page 23
2-11
SECTION 2 – SET-UP OF PART 1 WING
NOTE: Drawings for steps 9 through 17 is on previous page.
9. Install gauge wheel support (8T4090) onto wing with 7/8 x 2-1/2” bolts.
NOTE: STEPS 10 THROUGH 14 MAY HAVE BEEN PRE-ASSEMBLED AT FACTORY
10. Apply anti-seize to jack bolt (8T6000) threads. Screw jack bolt into axle holder (8T4094) far
enough to see hole on bottom of bolt through hole in axle holder.
– Insert 3/16 x 2” roll pin. Insert pin far enough so it will clear tube when rotated.
11. Place gauge wheel depth decal on axle holder.
– Locate decal 1” from bottom of 4 x 4 tube.
– Make sure that decal faces the front of the machine.
– Attach decal off to one side of axle holder to avoid seam on support tube.
12. Slide axle holder and jack bolt into gauge wheel support. Slide 1-1/4” flat washer onto bolt and
turn 1-1/4” slotted nut on.
– Do not tighten slotted nut.
13. Add gauge wheel screw top onto jack bolt.
– Insert 1/2 x 2-1/4” bolt into screw top and bolt. Secure with locknut.
14. Attach gauge wheel jack handle to screw top.
– Install 3/8 x 2” bolt in handle and screw top. Secure with locknut.
– Do not over tighten. Handle must pivot freely.
15. Check free operation of gauge wheel assembly.
– Loosen or tighten slotted nut for optimum performance of gauge wheel.
– Install 3/16” x 2” roll pin after slotted nut is adjusted properly.
15a. Adjust clearance between 8T4090 and 8T4094 with 3/4” set bolts and jam nuts.
16. Install 8K1100 (6 bolt) axle and hub assembly into each receiver tube. Apply good quality anti-seize
to axles before installation. Retain axle into receiver tube with 1/2x3-3/4” bolt and locknut.
17. Attach 11L x 15 wheel to hub with 9/16” wheel bolts (torque required: 122 ft-lbs).