Summers Superchisel - 5-Section User Manual
Page 19
2-7
SECTION 2 – SET-UP OF CENTER SECTION
14. Attach hitch to center with 1-1/2” x 10-5/8” pins.
NOTE: Center with 1-1/2” ID 10 GA flat washers.
15. Install 7/16x3-1/2” retaining bolts through hitch pivot pins. Secure with locknuts.
16. Attach hydraulic hose holder and tip holder with 3/4 x 1-1/4” bolt and flat washer.
17. Attach hitch jack to jack spool.
18. Remove blocks from under center frame and allow wheel assemblies to support machine. Block
tires to prevent movement.
19. Add depth control cylinder locks and storage bases.
– Attach locks for rear cylinders by liftarm pivots located closest to center of machine.
– Locate lock for front center cylinder on front 4 x 4 tube.
20. Install SMV sign mounting bracket and sign at center of rear rank.
21. Place adjustment wrenches on clevis pins found on left hand of center section. Retain with hair
pin clips.