Summers Hydraulic Fold Coil User Manual
Page 40

SECTION 2 - ASSEMBLY
2-30
HYD. FOLD PACKER ASSEMBLY - PHOTO SUPPLEMENT – 42’ SHOWN
Coils
51. Lay out Coils and Pull Frames.
52. Identify Left and Right Hand Coils by com-
paring to bolt heads.
53. Bearing installed with snap ring.
54. Pre-assembly of 1/2” nuts on bearing at-
tach u-bolt.
55. Bearing attached to Pull Frame.