beautypg.com

Lokar Automatic Transmission Shifter GM Bell Crank Kit For Lokar User Manual

Lokar For the car

background image

Building American Quality… With A Lifetime Warranty!

General Installation Notes:

Please read these instructions completely before beginning the installation.

If you have any questions please call.

Before beginning the installation, disconnect the negative battery cable and

use wheel chocks to block the vehicle's wheels.

Refer to Fig. 1 for the component names.
NOTE:
If your transmission has an electronic speedometer output, you will need a

special bracket and bolt. Please call Lokar Technical Support for assistance.

Step 1: Install the Lokar Shifter (not included) onto the transmission following the

instructions that came with the shifter, but stop before measuring and

cutting the threaded rod that connects the quad lever on the shifter to the

trans gear lever on the transmission. Put the transmission and the shifter

in Park.

Step 2: Remove two rod ends from the linkage that originally came with the Lokar

shifter. They will be required for this installation.

Step 3: Install the bell crank arm with clevis onto the lower transmission tail

housing bolt on the left side of the transmission using the supplied bolt and

lock washer. There are two bolts and lock washers included in the kit. One

bolt is a metric (M10 x 45) hex head and one bolt is a standard

(3/8"-16 x 1-3/4") button head. Use the one that matches the thread

on the bolt you removed.

Fig. 2

Step 4: Install the linkage arm into the bell crank arm with clevis, using the

5/16"-24 x 7/8" button head bolt and nylock nut. Tighten the nut, but

make sure that the linkage arm still moves freely.

Fig. 3

Step 5: Install the trans gear lever (not included, it comes with the Lokar shifter)

onto the transmission selector shaft, if you haven't already done so. Make

sure that the transmission selector shaft is in Park (rotated clockwise as

far as it will go), with the trans gear lever at approximately the one o'clock

position.

Step 6: Position the linkage arm at the same angle as the trans gear lever. Measure

the distance from the center of the 1/4" hole in the trans gear lever to

the center of the 1/4" hole in the linkage arm. Subtract 1-3/4" from your

measurement and write it down.

Step 7: Remove the rod end from one of the threaded rods that came with the bell

crank kit. Cut the threaded rod to the length you calculated in the previous

step and de-burr the end. Make sure two 1/4"-28 jam nuts are on the

threaded rod, and install a rod end on both ends of the threaded rod (using

one rod end from the Lokar shifter) to create the lower rod assembly.

TOLL FREE 1-877-469-7440 • (865) 966-2269 • FAX (865) 671-1999 • [email protected] • www.lokar.com

®

GM Bell Crank Kit For Lokar Automatic Transmission Shifter

Installation Instructions

For TH350, TH400, 700-R4, and 4L60

For TH350, TH400, 700-R4, and 4L60

INS0111 Rev. 07/31/2014

Page 1

© 2009 Lokar, Inc.

GM Bell Crank Kit For Lokar Automatic Transmission Shifter

Installation Instructions

Step 11: Connect the upper rod assembly to the quad lever using the hardware

that came with the Lokar shifter. Make sure the rod end is sandwiched
between the quad lever and the flat washer.

Step 12: Disconnect the lower rod assembly from the linkage arm. Install both the

upper and lower rod assemblies to the outside of the linkage arm (away
from the transmission), with the upper rod assembly between the lower
rod assembly and the linkage arm.

Fig. 5

Step 13: Make sure there isn't any slack in the shifter when it is in the Park

position. If there is, lengthen the upper rod to remove the slack. Once
you have all the slack adjusted out of the shifter, make sure that the
button in the shift knob moves up and down freely. For final shifter
adjustments, refer to the Lokar Shifter Installation Instructions.

Rod Ends

1/4"–28 Jam Nuts

1/4"-28 x 1-1/2" Button
Head Bolt with Flat
Washers and Nylock Nut

Linkage Arm

Bell Crank Arm
with Clevis

M10x45 Hex
Head Bolt with
Lock Washer

3/8"-16 x 1-3/4"
Button Head
Bolt with Lock
Washer

5/16"-24 x 7/8" Button
Head Bolt with Nylock Nut

Threaded Rods

1/4"–28 Jam Nuts

Step 8: Install the lower rod assembly onto the inside of the trans gear lever (towards

the transmission) using the 1/4"-28 x 1" button head bolt and nylock nut

that came with the Lokar shifter. Make sure the rod end is sandwiched

between the trans gear lever and the flat washer. Temporarily connect the

opposite end of the lower rod assembly to the outside of the linkage arm

(away from transmission) using the supplied 1/4"-28 x 1-1/2" button head

bolt, flat washers and nylock nut.

Fig. 4

Step 9: Verify that the shifter and the transmission are both still in the Park

position. Measure the distance from the center of the 1/4" hole in the
quad lever to the center of the bolt you just installed in the linkage arm.
Subtract 1-3/4" from your measurement and write it down.

Step 10: Remove the rod end from the other threaded rod that came with the

bell crank kit. Cut the threaded rod to the length you calculated in the
previous step and de-burr the end. Make sure two jam nuts are on the
threaded rod, and install a rod end on both ends of the threaded rod to
create the upper rod assembly.

Fig. 1