beautypg.com

13 power cord replacement – AirSep MN138-1 H User Manual

Page 28

background image

22

MN138-1 Rev H

02/14

Flowmeter Installation
1. To install a new flow meter, follow the flow meter removal procedure in reverse

order. Leak test the tubing connections.

2. Assure flow meter reads

½

liter above the maximum flow rate when fully opened.

(Refer to section 4.8 Product Regulator Check and Setting for proper adjustment as
needed).

3. To avoid the possibility of activating no flow alarm, set flow meter to desired liter

flow prior to turning unit off.

4.13 Power Cord Replacement

Power Cord Removal
To remove the power cord, follow the steps below:

1. Set the unit’s

I

/0 switch to the “0” position and unplug the power cord.

2. Remove both front and back panels.
3. Using a Phillips-head screwdriver, remove screw securing the right mounting

plate assembly from the center section.

4. Carefully pull out assembly and disconnect the power cord wire connections from

the hourmeter (white) and circuit breaker (black).

5. From the back of unit, completely pull power cord out of holder and unwrap the

power cord wires from the ferrite bead (ring). Please note configuration of wires
around the ferrite ring at this time. Do not dispose ring.

6. Using large adjustable pliers, remove power cord strain relief from base of unit by

pressing in the top and bottom of the strain relief while pulling out towards you at
the same time.

Power Cord Installation
To install a new power cord, follow the steps below.

1. Place both new power cord and old power cord together (side-by-side) to

determine location to install strain relief on new power cord.

2. Route both wire ends of new power cord into entry location on the base of unit

and pull power cord through hole to the pre-determined location to install strain
relief to new power cord.

3. Install strain relief onto power cord and secure power cord to base.
4. Locate ferrite ring and insert both wire leads from new power cord into the center

of ferrite ring so that the outside insulation of power cord is flush with the inside
rim of ferrite ring.

5. Continue to wrap both power cord wires around and through the center of ferrite

ring 6 times. (The last few times will require wires to be inserted individually
one at a time into center of ferrite ring.)

6. Insert power cord into holding clamps located to the right of the left sieve bed,

and route the power cord to the inside of the top left sieve bed tubing connection.

7. Reconnect the white wire from power cord to the hour meter and the black wire

from power cord to the circuit breaker.

8. Reinstall right mounting plate assembly to center section using a Phillips-head

screwdriver.

9. When properly installed, ferrite ring should be located in the recessed area behind

the right mounting plate assembly.

10.

Reinstall both covers and turn unit on to confirm operation

.