beautypg.com

Mini-sas cable option – HP ProLiant DL380e Gen8 Server User Manual

Page 47

background image

Hardware options installation 47

SFF drive

8.

Connect the rest of the drive cables required in this drive configuration. For more information, see
"Storage cabling (on page

83

)."

9.

Install the PCI riser cages. ("

Install the PCI riser cages

" on page

26

)

10.

Install the air baffle (on page

24

).

11.

Install the access panel (on page

24

).

12.

Install the server into the rack ("

Installing the server into the rack

" on page

33

).

13.

Power up the server (on page

20

).

CAUTION:

To prevent improper cooling and thermal damage, do not operate the server unless

all bays are populated with either a component or a blank.

14.

Install the drives ("

Installing a hot-plug drive

" on page

37

).

Mini-SAS cable option

To connect the cable option:

1.

Power down the server (on page

20

).

2.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

3.

Do one of the following:

o

Extend the server from the rack (on page

20

).

o

Remove the server from the rack (on page

22

).

4.

Remove the access panel (on page

23

).

5.

Remove the air baffle (on page

24

).

6.

Remove the PCI riser cage ("

Remove the PCI riser cages

" on page

25

).

7.

Install the storage controller ("

Installing a storage controller

" on page

50

).