beautypg.com

3 powering up the system, Powering up the system – Spectrex Quasar 900 Open-Path Gas Detection System User Manual

Page 50

background image

SafEye

TM

Quasar 900 Gas Detector

38

Powering up the System

3

Install the Telescope Assembly (12) on the detector/source front. Fasten
the Telescope with Fastening Screws (13).

4

Crude Alignment

a

Use ¼” Allen screw driver for all alignment screws

b

Loosen screws 5, 6

c

Approximately aim the source horizontally toward the detector

d

Tighten screw 6

e

Loosen screws 3, 4

f

Approximately aim the source vertically toward the detector

g

Tighten screw 3

5

Repeat step 4 for the Detector

6

Fine Alignment

a

Aim the Source to the Detector within horizontal axis using screws

7. Aim the cross to the detector or source center of the front
window (see figure 1 & 2 item 8).

b

Tighten screw 5

c

Aim within the vertical axis using screw 8

d

Tighten screw 4

e

Make sure the telescope cross is pointing to the detector and

source center of the window

7

Repeat step 6 for the Detector alignment

8

Remove the telescope. Install the front shield.

6.3

Powering up the System

Important! Prior to any operation or maintenance, follow the Safety
Precautions,
page 39.

To power up the system:

1

Make sure that the Source and Detector are connected to power.

2

Make sure that the 4-20mA meter is connected to the Detector.

3

Power up the system 18-32VDC.

4

After 60 seconds, the current meter will indicate 4mA.

Note: Zero calibration should be performed after powering up the system
(see Zero Calibration, page 40).