3 powering up the system, Powering up the system – Spectrex Quasar 900 Open-Path Gas Detection System User Manual
Page 50
SafEye
TM
Quasar 900 Gas Detector
38
Powering up the System
3
Install the Telescope Assembly (12) on the detector/source front. Fasten
the Telescope with Fastening Screws (13).
4
Crude Alignment
a
Use ¼” Allen screw driver for all alignment screws
b
Loosen screws 5, 6
c
Approximately aim the source horizontally toward the detector
d
Tighten screw 6
e
Loosen screws 3, 4
f
Approximately aim the source vertically toward the detector
g
Tighten screw 3
5
Repeat step 4 for the Detector
6
Fine Alignment
a
Aim the Source to the Detector within horizontal axis using screws
7. Aim the cross to the detector or source center of the front
window (see figure 1 & 2 item 8).
b
Tighten screw 5
c
Aim within the vertical axis using screw 8
d
Tighten screw 4
e
Make sure the telescope cross is pointing to the detector and
source center of the window
7
Repeat step 6 for the Detector alignment
8
Remove the telescope. Install the front shield.
6.3
Powering up the System
Important! Prior to any operation or maintenance, follow the Safety
Precautions, page 39.
➣
To power up the system:
1
Make sure that the Source and Detector are connected to power.
2
Make sure that the 4-20mA meter is connected to the Detector.
3
Power up the system 18-32VDC.
4
After 60 seconds, the current meter will indicate 4mA.
Note: Zero calibration should be performed after powering up the system
(see Zero Calibration, page 40).