beautypg.com

2 installing the detector, 1 general guidelines, Installing the detector – Spectrex 40/40U-UB - UV Flame Detector User Manual

Page 31: General guidelines, 2installing the detector

background image

General Guidelines

19

2

Installing the Detector

In this chapter…

General Guidelines

page 19

Unpacking the Product

page 20

Required Tools

page 21

Certification Instructions

page 22

Installation Cables

page 23

Installing the Tilt Mount (part no. 40/40-001) page 24

Connecting the Detector

page 26

Configuring your Detector

page 29

This chapter provides basic guidelines for installing the detector. It does not
attempt to cover all of the standard practices and codes of installation.
Rather, it emphasizes specific points of consideration and provides some
general rules for qualified personnel. Wherever applicable, special safety
precautions are stressed.

2.1

General Guidelines

To ensure optimal performance and an efficient installation, consider the
following guidelines:

Sensitivity: To determine the level of sensitivity, consider the following:

Size of fire at the required distance to be detected

Type of flammable materials

Wiring:

The wire gauge must be designed according to the distance from the
detector to the controller and the number of detectors on the same
power line. See Wiring Instructions on page 49.

To fully comply with EMC directive and protect against interference
caused by RFI and EMI, the cable to the detector must be shielded
and the detector must be grounded. The shield should be grounded
at the detector end.

Spacing and Location: The number of detectors and their locations in
the protected area are determined by:

Size of the protected area

Sensitivity of the detectors

Obstructed lines of sight

Cone of view of the detectors