beautypg.com

Operation, Ready status a e r, Ystart testing – GW Instek GPT-9900 series Quick Start Guide User Manual

Page 19: Press the start button to begin testing, The tester will go into test status, Zero function (gb test only), Press the start button to perform the zeroing, The tester will go into the zero status

background image

OPERATION

19

Z E R 0

I R

G B

A CW

D CW

E

F R E Q =

0 H z

6

0

3 01

A

G B V = V

M

T I

E

= 0 0 3 . 2 S

R

. 0 m Ω

E

R F

=

#

0 0

0

0 0 . 0 m Ω

I

H

E

S

= 3

T

M

M A U

N

N A

_

2

M A N U = * * * - 0 0

m Ω

READY status

A

E

R

D

Y

Start Testing

Press the START button to begin testing.

The tester will go into TEST status.

START

WARNING

If Double Action is active, the START button must
be pressed 500ms after the STOP button was
pressed to be able to start testing.

WARNING

If INTERLOCK is set to ON and the interlock key is
not connected to the SIGNAL I/O port,
INTERLOCK OPEN will be displayed on the screen,
preventing the test from starting. See page 25 for
the Common Utility settings.

Return to VIEW Status

Press the MANU/AUTO key when in READY status
to return to VIEW status.

MANU/AUTO

ZERO function (GB test only)

Short the SOURCE H/L & SENSE H/L terminals using
the GLT-115 alligator clips.

In the READY status, press the ZERO soft-key.

Press the START button to perform the zeroing.

The tester will go into the ZERO status.

When finished the tester will return to the VIEW status
and the REF# will be set as measured resistance from
the zeroing.

E R O

Z

START