Glc-9000 quick start guide – GW Instek GPT-9800 series User Manual User Manual
Page 18
GLC-9000 Quick Start Guide
18
Power Up
Press the power switch to turn
on the power. The system will
enter the measurement
interface after a quick
initialization. The interface
panel will appear after a short
time.
Max :
Min:
Name:
Class:
I
Network:
E
Wait for setting…
Save Recall
Hard
Copy
Network
Class
Leakage
Limit
System
AC+DC
Current
AUTO
Meas
AUTO
Range
14:58 2009.09.01
Leakage:
Enclo-Enclo
Probe:
T1/T2
Current :
Judge:
Lower limit:
OFF
Wait time:
120 sec
Upper limit:
12.00mA
Meas time:
220 sec
AC+DC
Current
clear
graph
Key unlock
Shutdown
Before shutdown, ensure the EUT is shut down
properly. As illustrated below, power off the
circuit breaker before turning off the equipment.
After the EUT is powered down, the GLC-9000 can
be powered down.