beautypg.com

Triton ARGO User Manual User Manual

Page 81

background image

G-4

A

PPENDIX

G

To Install the T9 Keypad

The T9 EPP Keypad is a drop in replacement for new units manufactured with a T5 or T7 EPP Keypad.
No additional parts are required.
• All RL1613, Traverse and ARGO were manufacturered with a T5 or T7 EPP. (See NOTE below)

All X2 RL23XX, RL53XX and RT23XX were manufactured with a T5 or T7 EPP beginning January
2, 2008 (Julian date of 08002).

If the ATM has been updated from VISA T1 EPP to T7 OR it needs to be updated from a VISA T1 EPP,
the applicable kits are available.

All XScale RL51XX, RT21XX and FT51XX were manufacturered with VISA T1 EPP
beginning December 29, 2004 (Julian date of 04363). Field Installation Instructions are available on
www.TritonATM.com.

The software must be updated to 3.3.2 or newer.

* NOTE*

To install the T9 into the Traverse Unit:

While holding the T9 EPP Keypad on a slight angle,

position the keypad notch over the tab on the mounting bracket.

Install the top of the keypad from left to right (from the rear) ensuring the keypad gasket is sitting fl ush

against the control panel. Using slight pressure if needed, ensure the bottom half of the keypad is also

sitting fl ush with the control panel. Secure the keypad with the 6 screws.

Mounting Bracket Tab

Keypad Notch