Spectra Precision Survey Pro v3.80 Ranger GPS User Manual User Manual
Page 43
RTK Data Collection
39
Note: If you select a point from the job’s control file, you will be
prompted to make a local copy of the point. Control point collection
will add a geodetic coordinate to the point record and points in the
job’s control file cannot be modified.
Note: If
Store GPS Raw
Data on the Measure Mode card of the Job,
Settings screen is set to
EP + Rx Raw
(or + OBN for Ashtech users),
when you begin a point occupation the control point name is checked
as a valid site ID for the receiver. If it is not a valid site ID, we will
use a modified point name in the receiver’s internal file and make a
note of the modified name in the job’s .RAW file. The point name in
Survey Pro is not changed.
3.
Occupy the point and tap
&RQWURO 3RLQW to begin data collection.
4.
When you are happy with the measurement, tap
$FFHSW.
5.
Check the Results tab for details of the previous measurement.
Check the Map tab to see the number and position of control
points for this set up group.
6.
Collect a minimum of 2 control points to solve horizontal
localization. Collect a minimum of three vertical control points to
solve vertical localization. Collect one vertical control point to
solve just the localization vertical shift when using a geoid model.
7.
When you have collected the minimum number of control points,
tap
3URMHFWLRQ to open the Projection screen.