beautypg.com

Hired-Hand Bunsen Jet Brooders: Super-Saver Bunsen Jet (Radiant Brooder with Hot Surface Ignition) User Manual

Page 8

background image

Part No. 4801-0062 rev 7-05

Super Saver Bunsen Jet

Page

8 of 18

7.1.

Hanging the Unit

7.1.1.

Hanging HSI Brooder with 48” Diameter Canopy

The hanging kit for the 48”diameter brooder canopy includes a 14” chain and three 6” chains
which must be attached as shown in Fig. 1 to ensure that the canopy will hang level. Join the
three smaller chains in the center with a single S-hook. The three smaller chains will connect
(with S-hooks) to the holes in the lower left and right hand side of the control enclosure, and
to the suspension S-hook. The 14” chain will attach (with an S-hook) to the hole in the top of
the suspension rod directly opposite the controls enclosure, and to the suspension S-hook. Be
sure to crimp the ends of the S-hooks with wire pliers before hanging the unit. This will help
minimize the chance of the hooks straightening out.

If your brooder does not hang level, the length of the 14” chain may be adjusted to acquire
levelness of the brooder. Use a carpenter’s level to check that the brooder is level.




































Fig. 1

48" Diameter Canopy

Pulley

Suspension S-Hook

Pulley

Note: It is important that the brooder canopy

remains level at all times.