beautypg.com

7 two or more geo s12 flown vertically, Required items, Procedure – Nexo LS18 User Manual

Page 55

background image

GEO

S12

HARDWARE SETUP PROCEDURE

Page 55/103

8.4.7 Two or more GEO S12 flown vertically

Required items

N Pair of Rigging Plates (GPT-XBOW) for N cabinets;

1 lifting ring (VNT-XHBRK) every two GEO S12;

4xN Quick release pins for N cabinets;

Properly rated slings, shackles, hoists… (not provided)

IMPORTANT

Lifting ring VNT-XHBRK and truss hook VNT-TCBRK are rated for a maximum of 2 GEO
S12s;

Ensure that suspension points are rated accordingly.

Procedure

Insert GPT-XBOW into connecting plates of both sides of the cabinet;

Lock safety pins into GEO S12s connecting plate;

IMPORTANT

Ensure that safety pins are properly locked into GEO S12s connecting panels.






















This manual is related to the following products: