4 single geo s12 flown horizontally, Required items, Procedure – Nexo LS18 User Manual
Page 49
GEO
S12
HARDWARE SETUP PROCEDURE
Page 49/103
8.4.4 Single GEO S12 flown horizontally
Required items
1 x “U” Bracket for single horizontal GEO S12 (GPT-SSBRK)
1 x Lifting Ring (VNT-XHBRK)
Or 1 x Truss hook (VNT-TCBRK)
IMPORTANT
Ensure that suspension point is strong enough to hold GEO S12 weight.
Procedure
Slide GPT-SSBRK side plates into GEO S12 connecting plate oblong holes;
Lock safety pins into GEO S12 connecting plate;
IMPORTANT
Ensure that safety pins are properly locked into GEO S12 connecting panels.
Position “U” bracket over these side plates; align center holes;
Insert adjustment handles, adjust vertical angle and tight the handles to prevent GEO
S12 from rotating around “U” bracket;
Cable suspension:
Connect lifting ring VNT-XHBRK to “U” bracket by inserting 8x45 quick release pin
dedicated holes;
Ensure lifting ring is properly locked to “U” bracket;
Connect assembly to suspension point with sling and shackle (not provided).
Truss suspension
Connect truss hook VNT-TCBRK to “U” bracket by inserting 8x45 quick release pin in
dedicated holes;
Ensure truss hook is properly locked to “U” bracket;
Lift and position assembly, lock hook on truss suspension point and secure with hook
cable.