Test procedure for solenoids – Ramsey Winch DC-200 SERIES RAM-LOK User Manual
Page 26
24
TEST PROCEDURE FOR SOLENOIDS
Steps to follow when testing current fl ow through DC solenoids.
It should be noted that when testing a 12 volt or 24 volt solenoid, the DC motor and battery must
be of the same voltage.
To test the solenoids:
(See Figure 1).
1. Securely clamp a motor to a bench or work surface.
2. Attach a #6 gauge jumper wire from “A” terminal on the motor to one of the fi eld termi-
nals on the motor, (F-2).
3. Attach the other motor fi eld terminal (F-1) to one of the side terminals of the solenoid.
4. Ground the solenoid to the motor with a wire as shown.
5. Attach positive (+) battery wire to the opposite side terminal of solenoid.
Ground the negative (-) battery wire to the motor housing.
6. Touch “hot” wire, from the positive battery terminal, to small terminal of the solenoid.
7. The motor should now be running if the solenoid is good. If not, make sure the motor
will run directly from the battery. (See motor test procedure page 20).
8.
To test the upper contacts use the same hookup except use the top terminals.
(See Figure 2). When hooked up as shown in Figure 2, motor should start running.
When the “hot” wire is touched to the small terminal the motor will stop operating.
The top terminals are normally closed; ie: connected, and the side terminals open, or
not connected. When the solenoid operates, the top terminals are disconnected
and the side terminals are connected.
Take care not to bring hot wires into contact with ground in order to prevent electrical
arcing.
A
F1
F2
ISOLATED GROUND
TERMINAL
BATTERY
FIGURE-1
GROUND WIRE(-) FROM
SOLENOID TO MOTOR
MOTOR
SOLENOID
(TOP TERMINALS)
SIDE
SIDE
(SMALL)
(SMALL)
SIDE
SIDE
(TOP TERMINALS)
SOLENOID
MOTOR
GROUND WIRE(-) FROM
SOLENOID TO MOTOR
FIGURE-2
BATTERY
ISOLATED GROUND
TERMINAL
F2
F1
A