beautypg.com

Test procedure for solenoids – Ramsey Winch DC-200 SERIES RAM-LOK User Manual

Page 26

background image

24

TEST PROCEDURE FOR SOLENOIDS

Steps to follow when testing current fl ow through DC solenoids.
It should be noted that when testing a 12 volt or 24 volt solenoid, the DC motor and battery must
be of the same voltage.
To test the solenoids:

(See Figure 1).

1. Securely clamp a motor to a bench or work surface.

2. Attach a #6 gauge jumper wire from “A” terminal on the motor to one of the fi eld termi-

nals on the motor, (F-2).

3. Attach the other motor fi eld terminal (F-1) to one of the side terminals of the solenoid.

4. Ground the solenoid to the motor with a wire as shown.

5. Attach positive (+) battery wire to the opposite side terminal of solenoid.

Ground the negative (-) battery wire to the motor housing.

6. Touch “hot” wire, from the positive battery terminal, to small terminal of the solenoid.

7. The motor should now be running if the solenoid is good. If not, make sure the motor

will run directly from the battery. (See motor test procedure page 20).

8.

To test the upper contacts use the same hookup except use the top terminals.

(See Figure 2). When hooked up as shown in Figure 2, motor should start running.

When the “hot” wire is touched to the small terminal the motor will stop operating.

The top terminals are normally closed; ie: connected, and the side terminals open, or

not connected. When the solenoid operates, the top terminals are disconnected

and the side terminals are connected.

Take care not to bring hot wires into contact with ground in order to prevent electrical

arcing.

A

F1

F2

ISOLATED GROUND

TERMINAL

BATTERY

FIGURE-1

GROUND WIRE(-) FROM

SOLENOID TO MOTOR

MOTOR

SOLENOID

(TOP TERMINALS)

SIDE

SIDE

(SMALL)

(SMALL)

SIDE

SIDE

(TOP TERMINALS)

SOLENOID

MOTOR

GROUND WIRE(-) FROM

SOLENOID TO MOTOR

FIGURE-2

BATTERY

ISOLATED GROUND

TERMINAL

F2

F1

A