beautypg.com

Teledyne LeCroy UWBSpekChek and WiMedia Platform Test User Guide User Manual

Page 18

background image


UWBSpekChek™ WiMedia Platform Compliance
Test Guide

rev3.10

2

Page 18 of 33

Test procedure:


1.

Start analyzer capture.

2.

Test system starts the beacon period and sends a beacon in slots 2 and 3. The
BP Length is set to 13.

3.

Standard test start-up sequence.

4.

The test system starts transmitting an additional beacon in slot 6 and a signaling
slot without the movable bit set.

5.

The test system stops sending the beacon in slot 2 and simultaneously starts
sending the beacon in slot 6 with the movable bit set.

6.

After 2 seconds, test system stops beaconing.

7.

After at least 2 seconds, stop analyzer capture.

Test Case 1.11: TD.8.2.6.1 Overlapping Alien BP Requires BPST Realignment

This test verifies that the DUT will realign its BPST when it overlaps with an alien BPST.

Test procedure:


1.

Start analyzer capture.

2.

Test system starts the beacon period and sends a beacon in slots 2 and 3. The
BP Length is set to 13.

3.

Standard test start-up sequence.

4.

The test system changes the slot number in its beacon in slot 3 to 10, but
continues to send it in slot 3.

5.

In the following superframe, the test system stops transmitting the beacon in slot 2
and starts sending a beacon in the beacon slot immediately following the ‘slot 10’
beacon with the slot number set to 11.

6.

After 10 seconds, test system stops beaconing.

7.

After DUT and INTD are beaconing in slots 2 and 3 or at least 10 seconds
(whichever occurs first), stop analyzer capture.

Notes: