Teledyne LeCroy UWBSpekChek and WiMedia Platform Test User Guide User Manual
Page 17

UWBSpekChek™ WiMedia Platform Compliance
Test Guide
rev3.10
2
Page 17 of 33
slot 6 (non-movable). Test makes slot 2 & 3 available and after 4 superframes, DUT &
INTD should set movable and contract after 4 additional superframes.
Test procedure:
1.
Start analyzer capture.
2.
Test system starts the beacon period and sends a beacon in slots 2 and 3. The
BP Length is set to 13.
3.
Standard test start-up sequence.
4.
The test system starts transmitting an additional beacon in slot 6 and a signaling
slot without the movable bit set.
5.
The test system stops sending the beacons in slot 2 and 3.
6.
After 2 seconds, test system stops beaconing.
7.
After at least 2 seconds, stop analyzer capture.
Notes:
• Background observation checks verify DUT & INTD follow correct signaling and
slot contraction behavior.
Test Case 1.10: TD.8.2.5.2 Beacon Period Contraction Where Move Is Not Allowed
This test verifies that the DUT will not relocate its beacon to a lower slot when a beacon
in a higher indexed slot is movable. The tester occupies slots 2 and 3 then begins
sending a movable beacon in slot 6 and makes slot 3 available. DUT/INTD should not
contract while Tester beacon in slot 6 is movable.