beautypg.com

Teledyne LeCroy UWBSpekChek and WiMedia Platform Test User Guide User Manual

Page 17

background image


UWBSpekChek™ WiMedia Platform Compliance
Test Guide

rev3.10

2

Page 17 of 33

slot 6 (non-movable). Test makes slot 2 & 3 available and after 4 superframes, DUT &
INTD should set movable and contract after 4 additional superframes.

Test procedure:


1.

Start analyzer capture.

2.

Test system starts the beacon period and sends a beacon in slots 2 and 3. The
BP Length is set to 13.

3.

Standard test start-up sequence.

4.

The test system starts transmitting an additional beacon in slot 6 and a signaling
slot without the movable bit set.

5.

The test system stops sending the beacons in slot 2 and 3.

6.

After 2 seconds, test system stops beaconing.

7.

After at least 2 seconds, stop analyzer capture.


Notes:

• Background observation checks verify DUT & INTD follow correct signaling and
slot contraction behavior.

Test Case 1.10: TD.8.2.5.2 Beacon Period Contraction Where Move Is Not Allowed

This test verifies that the DUT will not relocate its beacon to a lower slot when a beacon
in a higher indexed slot is movable. The tester occupies slots 2 and 3 then begins
sending a movable beacon in slot 6 and makes slot 3 available. DUT/INTD should not
contract while Tester beacon in slot 6 is movable.