Programming parameters – APC Silcon DP300E Series User Manual

Page 21

background image

21

User Guide Silcon DP300E Series 480V 400-500kVA

7OA0004 US rev. 02

Programming Parameters

4.5

Parallel programming/operation

Programming parameters for advanced parallel operation
To use the advanced parallel functions the following parameters must be pro-
grammed:

1.

“Station number”

2.

“Highest station address”

3.

“Advanced power management”

4.

“APM test mode active”

5.

“Battery connection”

Description of settings.
1.

“Station number”

Valid station numbers: 1-9 stating the UPS parallel address in the system.

2.

“Highest station number”

Valid station numbers: 2-9 stating the number of UPS’s in the system.

3.

“Advanced power management”

“Disabled”: Advanced power management is inactive.

“PARALLEL+1”: Advanced power management is activated when the system
operates as PARALLEL+1, meaning that one system can be isolated without
overloading the remaining systems (N systems/UPS).

“REDUNDANT+1”: Advanced power management is activated when the
system operates as REDUNDANT+1, meaning that one system can be
isolated without overloading the remaining systems (N systems/UPS) with
one spare system.

4.

“APM test mode active”

“No”: Stand-by time will be 24 hours - on-line time will be 48 hours * N
systems.

“Yes”: Stand-by time will be 1 min. - on-line time will be 2 min. * N systems.

5.

“Battery connection”

“Separate”: Separate battery for this UPS.

“Common”: Common battery in a parallel system. When this setting is
chosen, the highest battery temperature that can be found in the parallelled
systems is used (for charge voltage compensating).

Programming guide.
Example with 3 systems in parallel with separate batteries.

Programme the station addresses 1-3: 1 for UPS 1, 2 for UPS 2 and 3 for UPS 3

All UPS systems have to be programmed to “Highest station address” = 3.

If APM should not be tested, “APM test mode active” must be “NO”.

If a system is isolated due to service the station numbers must be reprogrammed
for the remaining active systems starting with number 1 and ending with max.
number of active systems. No numbers must be left out in this sequence. Fur-
thermore “Highest station address” must be changed to number of active UPS’s
in parallel.

NOTE:
Common battery pack is a
technical possibility.
However, APC recommend
separate battery pack due to a
higher safety degree in con-
nection with redundant/parallel
operation.
The UPS system is prepared
for both solutions.