Section 5: service & maintenance, Recommended preventive maintenance schedule, Every month – Fairbanks Aegis Coil Scales User Manual
Page 29: Six (6) months, Performed, Performed every

04/10
29
51205 Rev. 2
Section 5: Service & Maintenance
5.1. RECOMMENDED PREVENTIVE MAINTENANCE SCHEDULE
5.1.1. Performed
every month
• Lift up the scale, checking all attached wires, wear points, and that all bolts are
securely tightened.
• Check all clearances around the scale for any obstructions or interference with
the free movement of the platform.
• Check deck surface for any signs of damage or deterioration. Fix as needed, or
move the scale’s position.
• Lower the scale onto its permanent position.
• Check all check bolt clearances, both with and without
a concentrated load over each section, one at a time.
• Check load cells for a level condition.
5.1.2. Performed every
six (6) months
• Lift up the scale, checking all attached wires, wear points, and that all bolts are
securely tightened.
• Check cups and "O" rings for any damage.
• Inspect and adjust all Check Bolts, using anti-seize on the threads.
• Ensure that the system is has proper ground connections
• Remove the J-box covers and inspect for water seepage.
• Check that all terminal screws and contacts are secure.
• Check that all jumpers are in place.
• Dress all wires, being certain they are completely off the
ground.
• Check that waterproof gland nuts are tight.
• Reinstall the box cover, fasten the latches, and check the seal.
• Check all clearances around the scale for any obstructions or interference with
the free movement of the platform.
• Check all bumper bolt clearances, both with and without a concentrated load over
each section, one at a time.