Section 4: Electrical Installation

04/10

24

51205 Rev. 2

4.2. WIRING THE JUNCTION BOX

4.2.1. Load Cells to J-Box

Wire the Load Cells to the Analog Summing Junction Box (

67171M

) using the

following steps.

1. Open the platform access cover, then the junction box cover.

2. Loosen all gland bushing nuts.

3. Wire the Junction Box according to the chart.

4. Follow the indicator installation manual to connect it with the platform.

5. Tighten all gland bushing nuts.

IMPORTANT NOTE:

Leave the Junction Box Cover off until all corner

adjustments are completed.