Unpacking – Fairbanks Aegis Coil Scales User Manual
Page 14

Section 3: Scale Installation
04/10
14
51205 Rev. 2
3.2.2. Unpacking
Follow these guidelines when unpacking all equipment.
• Check in all components and accessories according to the customer's order.
• Remove all components from their packing material, checking against the invoice
that they are accounted for and not damaged.
Advise the shipper immediately, if damage has occurred.
Keep the shipping container and packing material for future use.
Order any parts necessary to replace those which have been damaged.
Check the packing list.
The
CUSTOMER
is the
receiving party
if the equipment was shipped to
the Customer’s address.
FAIRBANKS
is the
receiving party
if the equipment was shipped to the
Fairbanks Service Center.
• Collect all necessary installation manuals for the
equipment and accessories.
• Open the equipment and perform an inspection, making
certain that all hardware, electrical connections and printed
circuit assemblies are secure.
• Do not reinstall the cover if the final installation is to be
performed after the pre-installation checkout.
• Do not load the platform if there is any evidence of damage
to the platform or supporting structure.
NOTE
:
It is the
receiving party’s responsibility
to document, notify, and
follow-up regarding shipping damage with the carrier.