Operation – Fulton Edge ICX or FB-F Vertical Tubeless Boilers (Steam), Gas Fired User Manual

Page 53

background image

44-G 0/01

Starting the Gas Fired Boiler
Stop! Make sure you have read

and followed all previous safety

information.
Check with local authorities where

approval for start-up is required.

In some localities, final inspection

of services may be required.
In general, ensure that the boiler

area is in conformance with estab-

lished boiler room requirements.

Review national and local codes.
Carry out the following procedure on

the initial start up of the boiler and on

every subsequent occasion when

restarting the boiler after a shut down.
1) Close the blow-off valve.

2) Close the water gauge drain

valve.

3) Open main steam stop valve at

the top of the boiler.

4) Open the water feed valve on

the boiler.

5) Open valves on makeup water

line to return if return system is used.
6) Place feedwater pump fused

switch in the "on" position.

NOTE

a) The fused disconnect switch

that controls the feed water pump

should be kept in the "on" position

at all times during the boiler opera-

tion as well as during the non-

operating period of the boiler.
b) This switch should be turned

"off" only when repairs or adjust-

ments should be made.

NOTE

The pump will continue to operate

until the water reaches the correct

level in the boiler. This level is

approximately the center of the

water gauge glass.
7)
Activate the boiler power on

switch, located on the side of the

panel box.
8) With the unit full of water the low

water safety relay(s) will be in a lock-

out mode. Press the low water safety

relay manual reset button located on

the side of the control panel box.

Operation