Description/Instructions

Boiler Installation
The Steam Supply
— Pipe the

steam supply line from the top right

side of the boiler.
The Steam Safety Valve
1)
Before installing, be sure that all

pipes and connections have been

blown clean. Pipe compound or

dope is used on external threads

only. Be sure inlet of valve is free of

any foreign material.

2) Do not use a pipe

wrench! When making

installation, use proper

type and size wrench.
3) The valve should be

installed in a vertical upright

position in the connection provided

on the top left side of the boiler

with no unnecessary inter-

vening pipe. Under no cir-

cumstances should there be

a shut off valve or restriction

of any kind between the

safety valve and the con-

nection provided.

4) Do not cap or plug drain

hole in the side of valve body.
5) Since the purpose of this

safety valve is to protect

against an overpressure situa-

tion, it will loudly discharge hot

steam in doing so. Therefore, it is

recommended that a discharge pipe

be securely installed and run to a

safe point of disposal.
6) When a discharge pipe is used,

it must be of a pipe size equal to or

greater than that of the valve outlet.

Use schedule 40 discharge pipe

only. Do not use schedule 80, extra

strong or double extra strong dis-

charge pipe or connections. It must

be as short and straight

as possible and so

arranged as to avoid undue

stress on the valve. It must

have an ample provision for drain-

ing condensate at or near the valve

outlet. It must terminate freely to

atmosphere with no intervening

valve of any description and it must

be securely anchored and supported.
The Steam Pressure Gauge

Assembly — The gauge should be

facing front towards the panel box

and/or operator of the boiler.

Except as noted, each assembly or

any of its component parts may be

oriented, other than as shown to

provide improved operating clear-

ances and/or view of gauge.

Before installing steam gauge on

the siphon, add a small amount of

water to the siphon to create a

water seal to buffer the gauge ele-

ment. This must be done to prevent

inaccurate pressure readings and

/or premature failure of the gauge.

Install the steam gauge into the

siphon on the water column.

Saftey Valve
Outlet

Steam Outlet

Steam

Pressure

Gauge

Inspection/

Test Valve

(Shown Open)

Steam

Siphon Loop

To

High Limit

Pressure

Control

To

Operating

Pressure

Control

Ball

Valve

(Open)

(Closed)

34-G 1/01