Safety Warnings/Precautions

Safety Warnings Cautions &

Notes

The following

WARNINGS,

CAUTIONS, and NOTES appear

in various chapters of this manual.

They are repeated on these safety

summary pages as an example and

for emphasis.
WARNINGS must be observed to

prevent serious injury, or death to

personnel.
CAUTIONS must be observed to

prevent damage or destruction of

equipment or loss of operating

effectiveness.
NOTES must be observed for

essential and effective operating

procedures, conditions, and as a

statement to be highlighted.

lt is the responsibility and duty of

all personnel involved in the opera-

tion and maintenance of this equip-

ment to fully understand the

WARNINGS, CAUTIONS, and

NOTES by which hazards are to be

reduced or eliminated. Personnel

must become thoroughly familiar

with all aspects of safety and

equipment prior to operation or

maintenance of the equipment.

CAUTION

Some soaps used for leak testing are

corrosive to certain types of metals.

Rinse all piping thoroughly with

clean water after leak check has been

completed.

NOTE

Where a condensate return tank is to

be fitted, this should:
1. Be vented and
2. Have a capacity sufficient to satisfy

boiler consumption as well as main-

tain proper return tank temperature.
3. Vent pipe should not be down-

sized (This may cause pressure build

up in the condensate tank.)
4. Return pipes must not be insulat-

ed. This can cause overheating the

return system, causing a vapor lock

in the pump.
5. See Return System Instruction

Manual for detailed instructions.

NOTE

Care should be taken to ensure that

the blow off receptacle used meets

the regulations covering such ves-

sels. If in doubt consult a Fulton

Representative for advice.

NOTE

Only properly trained personnel

should install and maintain water

gauge glass and connections. Wear

safety glasses during installation.

Before installing, make sure all parts

are free of chips and debris.

NOTE

Keep gauge glass in original packag-

ing until ready to install.

WARNING

Improper installation or maintenance

of gauge glass and connections can

cause immediate or delayed break-

age resulting in bodily injury and/or

property damage.

NOTE

After installation is complete and

prior to operation the pressure ves-

sel should be cleaned.

CAUTION

Do not store halogenated hydrocar-

bons near or in the boiler room.

NOTE

a) The fused disconnect switch that

controls the feed water pump should

be kept in the “on” position at all

times during the boiler operation as

well as during the non-operating

period of the boiler.
b) This switch should be turned “off”

only when repairs or adjustments

should be made.

NOTE

The pump will continue to operate

until the water reaches the correct

level in the boiler. This level is

approximately the center of the water

gauge glass.

WARNING

Prior to the commencement of any

work requiring the removal of cover

plates and the opening of the control

panel box, the electrical supply to the

boiler must be disconnected.

CAUTION

Do not tamper with the safety fea-

tures of the low water safety cut off.

WARNING

When stopping the boiler for any

extensive repairs, shut off main dis-

connect switches on both the boiler

side as well as the feed water side.

NOTE

To ensure that your Fulton Steam

Boiler is kept operating safely and

efficiently, follow the maintenance

procedures set forth in Section 4

of this manual.

NOTE

To ensure the continued safety and

efficiency of the boiler, the schedule

of maintenance outlined in this sec-

tion should be adhered to.

WARNING

Prior to the commencement of any

work requiring the removal of cover

plates and the opening of the control

panel box, the electrical supply to the

boiler must be disconnected.

NOTE

The scanner is located on the

outside edge of the burner top plate

for 20-60 HP.

NOTE

If only the top refractory is to be

changed, the bottom refractory need

not be broken.

NOTE

If the boiler is being operated auto-

matically on a time clock, the blow

off operation may be done once dur-

ing the working day and once at the

end of the day when at 10 PSIG or

less.

NOTE

Fulton recommends that the feedwa-

ter treatment should be added

between the pump and the boiler.

WARNING

Make sure main power switch is off

before starting work.

CAUTION

Do not clean the gauge or glass while

pressurized or in operation.

NOTE

After a new Fulton Boiler has been in

operation for several months, pieces

of burned metal will be found in the

space at the bottom of the boiler.

These pieces of metal are the

remains of a light gauge metal form

which was used during manufacture

for forming the boiler insulation. This

is a normal condition and does not

affect the efficiency or the life of the

boiler in any way.

This manual is related to the following products: