beautypg.com

Tube installation sequence – Detroit Radiant Products Company SV Series User Manual

Page 11

background image

Key

Tube Installation Sequence

SV

Series

11

20 Foot

50 Foot

60 Foot

70 Foot

30 Foot

40 Foot

Figure 2.4

Tube Installation Sequence

Burner Control Box with
16” Burner Tube

Combustion Chamber

Coated Aluminized
Radiant Emitter Tube

Standard Tube Clamp

Stainless Steel Tube
Clamp (P/N: TP-220)

175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.

Important! The combustion chamber & radiant tube sections must be installed in the following order.

Note: Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.

Baffle Location

80 Foot

Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).

Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).

Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).

Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).

Exhauster Pump Assembly

Security Chain Location (P/N: THCS)

2.0

Installation

Tube Installation Sequence

Heater Length