Tube installation sequence – Detroit Radiant Products Company SV Series User Manual
Page 11

Key
Tube Installation Sequence
SV
Series
11
20 Foot
50 Foot
60 Foot
70 Foot
30 Foot
40 Foot
Figure 2.4
•
Tube Installation Sequence
Burner Control Box with
16” Burner Tube
Combustion Chamber
Coated Aluminized
Radiant Emitter Tube
Standard Tube Clamp
Stainless Steel Tube
Clamp (P/N: TP-220)
175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.
Important! The combustion chamber & radiant tube sections must be installed in the following order.
Note: Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.
Baffle Location
80 Foot
Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).
Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).
Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).
Stainless steel clamp location on 175 - 200 MBH models only (P/N: TP-220).
Exhauster Pump Assembly
Security Chain Location (P/N: THCS)
2.0
Installation
•
Tube Installation Sequence
•
Heater Length