Before proceeding to connect air supply ensure for safety reasons the following steps are
taken. Refer also to image files in Last section of this manual

Solvent isolation valve turn to off (90º turn at right angles to valve flow)

Emergency Stop/ ON/OFF button is pushed down and locked - Machine OFF.

Solvent/Air flush switch is off (Pushed in)

Pump Start/Stop Control is switched to OFF as marked (90º turn)

PDC counter is set to zero 0000 counts and reset is pressed once firmly

Catalyst Ratio arm guard is screwed into position.

2.1 Connect shop air supply to machine located at rear top of machine chassis (8mm Push fit
connector) Yellow 8mm pipe supplied

2.2 Switch on air by partially anticlockwise rotating RED Emergency Stop/ON/OFF button. This
will enable it to turn the air ON by spring UP action.

2.3 Press blue pushbutton marked “RESET” located on upper right hand side of grey machine
chassis

2.4 Check machine pump operation by first clockwise increasing the Pump speed regulator
control to preset to 2 bar shown on Pump speed Pressure gauge.

2.5 Check Mix resin pressure regulator is preset at 1 bar shown on Mix resin pressure gauge by
clockwise increasing Mix resin regulator control.

2.6 Rotate to recirculation switch Pump control clockwise (90º)

2.7 The pump will now reciprocate

2.8. Turn Pump recirculation switch counter clockwise to OFF position

3.0 Priming SSB fluid sections. Catalyst, Resin, Solvent and pump

Lubrication.

NOTE - For safety reasons it is essential when carrying out any manual activity on the lower
guarded machine pump section that the machine is switched OFF.

3.1 Switch Machine OFF and for security isolate air by depressing E stop red button which will
lock down in OFF position