CHAPTER 2

INSTALL THE UNIT

Uncrate Unit

Uncrate the unit and set on level floor surface at least 3 feet from the nearest wall to allow easy access.

Tool List

When preparing the EPO3 for use, it is important to have all of the tools, spare parts, and the supplies
available before beginning operation. The following tools (not shipped with the unit) must be available
when using the EPO3.

Protective gloves approved for use with all materials to be handled.

Eyeglasses approved by local safety and health agencies.

Respiration equipment approved by material supplier and safety and health agencies.

Cleaning solvents approved by material supplier and safety and health agencies.

Suitable solvent containers with safety lids approved as proper for flammable conditions.

Full set of open-

ended wrenches (3/8”) through 1-½”)

Set of crescent wrenches (6”, 10”, and 12”).

Assortment of flat-

ended screwdrivers from 1/8” through 3/8” blade size.

One medium-weight hammer.

Pliers.

Swivel socket wrenches (3/8”, and ½”)

6” table vice.

14” pipe wrench.

Strap wrench.

Machinist’s scribe form removing O-rings.

Balance-beam scale.

Four material containers (two types: 5 gallon material holding and 1 quart pre-weighed for ratio

calculation).


Install Material Containers

Install material containers next to the unit, preferably with some method of heating material. Recirculation
through unit heaters can also be used for preheating small quantities of materials.

Remove Unit metal Cover


Remove unit’s metal cover during setup procedures.

Turn Front Panel Controls Off

Make sure the unit is not connected to power and that all MAIN PANEL controls are turned off and the
regulators are turne

d to “0” (zero) (see Figure 1).