A.18 option 11a plumbing and connections, Plumbing and connection options – Hach-Lange AMTAX indoor sc User Manual
Page 106

106
Plumbing and Connection Options
A.18 Option 11a plumbing and connections
Option 11a uses two units of any type of sample preparation that
delivers a continuous sample stream. The waste of the analyzer is
discharged to an open drain.
and the following instructions for Option 11a:
1. Install the sample preparation units.
2. Feed the two sample lines from each sample preparation unit
through the analyzer. Use Seal Plug #3 to secure.
3. Feed the drain tube through the analyzer using Seal Plug #3
(
, item 2).
Note: Tubes can be pushed through prepared holes on Seal Plug #3.
4. Seal the unused opening with Seal Plug #3.
5. Connect the drain tube to the T-fitting.
6. Connect the sample line from Sample Preparation 1 to the
bottom inlet on Overflow Vessel 1 using the fittings (item 4 and
item 5).
7. Connect the sample line from Sample Preparation 2 to the
bottom inlet on Overflow Vessel 2 using the fittings (item 3 and
item 6).