Achange & gasket installation, Side knockout removal, panel, P/b 1 4 – Alpha Technologies Te45 User Manual
Page 60: Detail a - inside view, Rear view, Right side view power enclosure shown, Insulation cut detail detail b - inside view
NAME
DATE
APPROVED
CHECKED
DRAWN
DESIGN
2009/09
2009/09
2009/09
2009/09
ME
KL
ME
JK
SCALE:
THESE DESIGNS AND SPECIFICATIONS ARE CONFIDENTIAL, REMAIN
THE PROPERTY OF ARGUS TECHNOLOGIES LTD., AND SHALL NOT
BE COPIED OR USED WITHOUT ITS WRITTEN CONSENT.
TYPE
0.5
D2
1
0.5
0.05
0.002]
[ 0.040]
[ 0.020]
[
UNITS: mm [in]
X [X.X]
X.X [X.XX]
X.XX [X.XXX]
ANGULAR:
OF
20
10 ALPHA TECHNOLOGIES
TITLE:
ISSUE
DATE
SIZE
B
DWG NO.
CUSTOMER CONNECTION,
KIT, INTERFACE, w/ CBL
SET, PWR TO BATT, Te45
747-670-08
SHEET
NTS
REV
P/B
1
4
ITEM
QTY
ME
2009/12
SDW
JK
UPDATED WIRING
P/B
REVISIONS
DESCRIPTION
LTR
APPD
DATE
DWN
CHKD
POWER AND BATTERY ENCLOSURE CONFIGURATION
SETUP & PREPARATION:
DETAIL A - INSIDE VIEW
B
REAR VIEW
Te45 POWER ENCLOSURE
Te45 BATTERY ENCLOSURE
A
CHANGE & GASKET INSTALLATION:
RIGHT SIDE VIEW
POWER ENCLOSURE SHOWN
IN ENCLOSURE MANUALS.
FOLLOW INSTALLATION PROCEDURE PROVIDED
BEFORE INSTALLING ENCLOSURE TO PAD.
REMOVE TOP CORNER KNOCKOUTS ON FACING
SIDES OF BOTH ENCLOSURES (2 PER SIDE)
TO ACCEPT BOLTING HARDWARE
REMOVE SIDE ACCESS CABLE
KNOCKOUTS ON FACING SIDES
OF BOTH ENCLOSURES.
INSTALL SEALING GASKET (ITEM 6)
AROUND K.O. OPENINGS ON
POWER ENCLOSURE SIDE ONLY.
SIDE KNOCKOUT REMOVAL, PANEL
6
2
EXISTING
CUT LINES
CUT AWAY A SMALL SECTION OF INNER
WALL INSULATION IN AREA OF SIDE
ACCESS CABLE KNOCKOUTS ON
BOTH ENCLOSURES AS SHOWN FOR
CHASE NIPPLE INSTALLATION.
INSULATION CUT DETAIL
DETAIL B - INSIDE VIEW
©