4.13.2 Procedure

1. Ensure that all AC breakers are in the off position at the AC source and within the AC panel.

2. To access the interior assembly, open the AC panel door and remove the cover.

3. Use the knockouts supplied on the AC enclosure for the cable routing.

4. Install the conduit nipple into the service entrance opening. Secure the nipple into place using the appropriate

locking nut(s) and sealing washer(s).

5. Review the AC panel documentation and then connect the AC cables.

6. Measure and record all voltages before switching on the main breaker. Do not switch on individual breakers.

7. If required, notify the local electrical inspector to approve the AC input wiring.

4.14 Other cable connections

Holes must not be drilled into the enclosure other than at conduit knockouts.

All cable entry fittings must be water tight.