beautypg.com

Technical service bulletin – Franklin Fueling Systems TS-LLD Field Verification : Functional Testing of the INCON TS-LLD User Manual

Page 2

background image

Tank Sentinel

Technical Service Bulletin

Technical Service Bulletin

0001143B.DOC

E - m a i l :

t e c h @ i n t e l c o n . c o m

F A X 1 - 2 0 7 - 2 8 2 - 9 0 0 2

T E L 1 - 8 0 0 - 9 8 4 - 6 2 6 6

P A G E

2 o f 2

s a l e s @ i n t e l c o n . c o m

F A X 1 - 2 0 7 - 2 8 3 - 0 1 5 8 T E L 1 - 8 0 0 - 8 7 2 - 3 4 5 5

< 0.2 gph Leak Detection >

(This will take at least 1 hour)

1. Turn off the electrical power to the TS-LLD / submersible pump where it’s installed.
2. Remove dispenser cover panel to gain access to the shear valve for the line being tested.
3. Remove the test port plug in the shear valve at the base of the dispenser.
4. Install a Leak Simulator and place its hose into an appropriate container (see page 1 for

details).

5. Turn the LLD / pump power back on and press the Reset / Test button on the Control Unit to

interrupt the test that automatically starts at power up. Lift a dispenser handle to activate the
pump and adjust the leak simulator for a leak rate greater than 0.2 gph but less than 3.0 gph,
this is typically a fast drip. Be sure the leak simulator hose is secured in place in the
appropriate container. Hang up the dispenser handle.

6. Turn the LLD / pump power off and then back on again, a 0.2 gph line test will begin

automatically (there will be a 30 sec delay before the pump comes on). The simulated leak
must already be set before the pump comes on! After approximately 3 minutes the LLD
system will have completed the 3 gph leak test and moved on into the first cycle of the 0.2
gph test. If a 3 gph leak is detected than you should press the Reset / Test button and start
over, this time adjusting the leak simulator to a much slower leak rate. The 0.2 gph test will
take at least three 13 min. cycles to complete. The pump will shut off for two minutes
between cycles but the test will continue to run. The leak rate must be maintained
throughout the test. After the completion of the last cycle the TS-LLD will detect the leak and
shut down the pump. The Control Unit display will show a flashing “2” and the line leak
detected light will be flashing.

7. Push the reset button on the TS-LLD Control Unit to restore normal system operation after a

simulated leak is detected. During the next 24 hrs the system should pass a 0.2 gph test and
shut off the line leak detected light, or you may initiate another test after the leak simulator
has been removed. ( see next step ) INCON recommends clearing all line leak alarms before
leaving the site

8. After the leak detection function of the system has been verified: Turn-off power to the

TS-LLD / pump. Remove the leak simulator from the shear valve and re-install the original
plug. Re-install the dispenser panel and restore power. This completes the test.

❖ —