2. The field installed condensate drain line must not be less

than 1/2 inch PVC in size.

3. do not remove, modify or alter the factory condensate trap.
installation instructions
1. Ensure the water heater’s on/off switch is in the “off” position.
2. Install a 1/2 inch PVC condensate drain line between the

condensate drain connection on the Condensate Drain Trap

and a suitable building drain, see Figure 50 and Figure 51.

3. Terminate the condensate drain piping with an elbow above

the drain. Ensure that any discharge will exit the condensate

drain line no more than 6 inches (15.2 cm) above a suitable

building drain, or external to the building, see Figure 50.
note:

In cold climates it is recommended the condensate

drain be terminated at a suitable drain inside the building.

4. Ensure the condensate drain line is not elevated above the

condensate drain connection on the trap, see Figure 51.

5. brace the condensate drain line with floor mounted standoffs

every three feet.

6. Ensure the condensate drains freely during start up, see

Start up on page 49.

water heater installation

condensate drain installation

Installation must conform with these instructions and local

building codes.
Condensate neutralizer kits are available. Contact your distributor

or Service Agency.
Field supplied materials required for installation include:

• Approved PVC cement and PVC primer.
• 1/2 inch PVC pipe - minimum length to equal the distance

between the water heater and a suitable building drain.

• 1/2 inch PVC fittings (elbows and couplings) necessary to

install a condensate drain line between the Condensate

Drain Trap Assembly and a suitable building drain.

• Floor mounted standoffs to brace the drain line.

installation notes
1. The condensate drains from the water heater’s covered by

this instruction have PH levels between 4.3 and 5.0. Install

a commercially available neutralizing kit if required by local

codes. Lower PH levels are acidic. Do not connect a metal

condensate drain line, such as copper pipe, to the water

heater for this reason.

CONDENSATE DRAIN

LINE - FIELD INSTALLED

DRAIN LINE TO

TERMINATE NO

MORE THAN 6

INCHES (15.2 cm)

ABOVE DRAIN

BUILDING

DRAIN

FACTORY INSTALLED

CONDENSATE TRAP

CLEANOUT PLUG SHOULD

FACE TOWARDS THE FRONT

OF THE WATER HEATER FOR

SERVICE ACCESS

EXHAUST (VENT)

ELBOW

CONDENSATE TRAP DETAIL

PVC PIPE PLUG

1 ¼” NPT
CLEANOUT PIPE

PLUG SHOULD

BE ORIENTED TO

THE FRONT OF THE

WATER HEATER FOR

SERVICE ACCESS

PVC BUSHING

1 ½” SLIP x 1 ¼” NPT

PVC BUSHING

1 ½” SLIP x ½” SLIP

PVC TEE FITTING

1 ½” SLIP x 1 ½” SLIP x ½” NPT

PVC PIPE NIPPLE

½” NPT

½” PVC 90° ELBOW

CONDENSATE DRAIN

CONNECTION. FIELD

INSTALLED DRAIN

LINE CONNECTS HERE

½” PVC 90°

STREET ELBOW

½” PVC PIPE NIPPLE

figure 50