14. If installing 4 inch intake air pipe connect the intake air pipe to

the intake air connection on the water heater.

15. If installing 6” intake air pipe transition to 4” pipe at the intake

air connection on the water heater as shown in Figure 18.

The field installed 4” pipe between the intake air connection

and the 6” x 4” reducer coupling should be 18 inches (45 cm)

or less in length.

3” PIPE FACTORY

INSTALLED

6” PIPE FIELD

SUPPLIED

4” PIPE FIELD

SUPPLIED

6” x 4” REDUCER

FIELD SUPPLIED

4” x 3” REDUCER

FACTORY INSTALLED

INTAKE AIR CONNECTION

INTAKE AIR CONNECTION

INTAKE AIR

COMBUSTION

BLOWER

figure 18

Vertical termination installation

1. Determine the location for the termination(s).
2. If installing only the vent (exhaust) piping in a Power Vent

configuration vertically through the roof; ensure that all

exterior vertical clearance requirements shown in Figure 19

and Figure 20 on page 24 are being maintained. These

clearances and those cited by local and national codes must

be maintained.
note:

On flat roof installations the vent termination must be

a minimum of 24 inches (60 cm) above any parapet, vertical

wall or structure within 10 feet (3 m) horizontally. See Figure

20 on page 24.

3. If installing both intake air and vent piping in a Direct Vent

configuration vertically through the roof; ensure that all

exterior vertical clearance requirements shown in Figure

19 and Figure 20 on page 24 are being maintained. These

clearances and those cited by local and national codes must

be maintained.
note:

On flat roof installations the intake air and the vent

terminations must be a minimum of 24 inches (60 cm) above

any parapet, vertical wall or structure within 10 feet (3 m)

horizontally. See Figure 20 on page 24.

4. If installing only vent piping in a Power Vent configuration

vertically through the roof the following instructions must be

followed:
The vent termination must be oriented facing downward as

shown in Figure 19 and Figure 20 on page 24.
The bottom edge of the vent termination must be a minimum

of 12 inches (30 cm), 18 inches (45 cm) in Canada, above

the average or expected snow level as shown in Figure 19

on page 24.

5. If installing both intake air and vent piping in a Direct Vent

configuration vertically through the roof the following

instructions must be followed:
The intake air and vent pipes must penetrate the same side

of the roof as shown in Figure 21 on page 24.

INSTALL TEE FITTING AS CLOSE TO WATER HEATER

INTAKE AIR CONNECTION AS POSSIBLE

INTAKE AIR CONDENSATE TEE INSTALLATION

FIELD SUPPLIED

3” x 3” x 1/2” TEE

WITH HOSE BARB

FITTING INSTALLED

FACTORY

INTAKE AIR

CONNECTION

INTAKE

AIR

PIPING

CONNECT FIELD

SUPPLIED FLEXIBLE

DRAIN HOSE TO BARB

FITTING AND FORM A

LOOP WATER TRAP IN

DRAIN HOSE

RUN DRAIN HOSE

TO SUITABLE FLOOR

DRAIN SEPARATELY

FROM OTHER

CONDENSATE DRAINS

figure 16

13. Ensure the balance Plate and Intake Air Screen on the Intake

Air Connection are both removed before connecting the

intake air pipe to the water heater, see Figure 17.

Do not obstruct water heater air intake.

Gas and carbon monoxide detectors

are available.

Install water heater in accordance with

the instruction manual.

Breathing carbon monoxide can cause brain damage or

death. Always read and understand instruction manual.

Breathing Hazard - Carbon Monoxide Gas

note:

Do not leave the screen inside the Intake Air

connection in Direct Vent installations. Once the intake air

pipe is installed the screen will be hidden from view and

may become clogged with debris over time. This will cause

improper combustion.

INTAKE AIR BALANCE PLATE AND SCREEN

4” x 3” REDUCER

COUPLING - FACTORY INSTALLED

BALANCE PLATE

(remove for Direct Vent)

INTAKE AIR SCREEN

(remove for Direct Vent)

figure 17