beautypg.com

4 inch concentric termination installation – John Wood Commercial - 300-400K BTU User Manual

Page 27

background image

27

4 inch concentric termination installation

4 INCH CONCENTRIC TERMINATION KIT

FOUR PIECE KIT - FIELD ASSEMBLY REQUIRED

VENT PIPE

INTAKE AIR CONNECTION

3 INCH PVC

VENT CONNECTION - 3 INCH PVC

INTAKE AIR PIPE

Y FITTING ASSEMBLY

VENT CAP

VENT PIPE ASSEMBLY

VENT PIPE IS 2 1/2 INCH SDR-26 PIPE

SUPPLIED LENGTH 37 INCHES (94 cm)

MAXIMUM ALLOWABLE LENGTH 73 INCHES (185 cm)

MINIMUM ALLOWABLE LENGTH 25 INCHES (64 cm)

INTAKE AIR PIPE IS 4 INCH SDR-26 PIPE

SUPPLIED LENGTH 24 INCHES (60 cm)

MAXIMUM ALLOWABLE LENGTH 60 INCHES (152 cm)

MINIMUM ALLOWABLE LENGTH 12 INCHES (30 cm)

VENT CAP

INTAKE AIR PIPE

3” x 3” x 4”

Y FITTING

figure 26

Assemble and install the 4 inch concentric termination. refer to

Figure 26, Figure 27 and Figure 28 for these instructions:
1. Cement the y fitting to the larger diameter intake air pipe.
2. Slide the intake air pipe and y fitting assembly from inside the

building through the hole cut for the termination in the roof

or sidewall. Ensure no foreign materials such as insulation

accumulate inside the assembly.

3. Secure the intake air y fitting assembly using field supplied

metal strapping or equivalent support materials.

4. On installations installed through the roof slide a field

supplied plumbing boot or roof flashing over the intake air y

fitting assembly and secure it to the roof.

5. Seal around the plumbing boot or roof flashing.
6. Cement the vent cap onto the vent pipe. Alternately a field-

supplied stainless steel screw may be used to secure the 2

components together when field disassembly is desired for

cleaning. A pilot hole must be drilled for the screw to prevent

damage/cracking of the vent cap and/or vent pipe.

7. Install the vent cap/vent pipe assembly into the intake air y

fitting assembly, Ensure small diameter vent pipe is cemented

and bottomed in the y fitting.

8. Connect the intake air and vent piping from the water heater

to the 4 inch concentric termination using field supplied 4” x

3” reducer couplings as needed.

9. return to Direct Vent Installation on page 22 to complete

the installation of the intake air and vent piping between the

concentric termination and the water heater.

NOTE: SECURING STRAP

MUST BE FIELD INSTALLED

TO PREVENT MOVEMENT

OF TERMINATION KIT

MAINTAIN 12” (30 cm)

18” (45 cm) FOR CANADA

MINIMUM CLEARANCE

ABOVE HIGHEST ANTICIPATED

SNOW LEVEL. MAXIMUM OF

24” (60 cm) ABOVE ROOF.

ROOF FLASHING

(field supplied)

STRAP

(field supplied)

VENT

PIPE

INTAKE

AIR PIPE

COMBUSTION

AIR

VENT

4 INCH CONCENTRIC TERMINATION

VERTICAL INSTALLATION

figure 27

NOTE: SECURING STRAP MUST BE

FIELD INSTALLED TO PREVENT

MOVEMENT OF TERMINATION KIT

IN SIDEWALL.

STRAP

(field supplied)

VENT

PIPE

INTAKE

AIR PIPE

COMBUSTION

AIR

VENT

1 INCH

MAXIMUM

4 INCH CONCENTRIC TERMINATION

SIDEWALL INSTALLATION

figure 28