Iii. installation, Final power connection procedures – Asus P/I-P55TP4N User Manual
Page 31

P/I-P55TP4N User's Manual
25
III. INSTALLATION
(Connectors)
III. INST
ALLA
TION
Final Power Connection Procedures
1. After all jumpers and connections are made, close the system case cover.
2. Make sure that all switches are in the off position as marked by
.
3. Connect the power supply cord into the power supply located on the
back of your system case as instructed by your system user's manual.
4. Connect the power cord into an power outlet that is equipped by a
surge protector.
5. You may then turn on your devices in the following order:
a.
Your monitor
b. External SCSI devices (starting with the last device on the chain)
c.
Your system power
6. The power LED on the front panel of the system case will light and the
monitor LED as well. The system will then run power-on tests. While
the tests are running, additional messages will appear on the screen. If
you do not see anything within 30 seconds from the time you turn on
the power, the system may have failed a power-on test. Recheck your
jumper settings and connections or call your authorized dealer for as-
sistance.
7. During power-on, hold down the
Follow the next section "BIOS SOFTWARE" for instructions.