Openings for input and output cable connections, 30 & 40 kva, Sg series – GE Industrial Solutions SG Series 10 – 20 – 30 – 40 kVA Installation Guide User Manual
Page 14

Openings for input and output cable connections
SG
T5
000
_0
10-
020
_U
PS
vie
w t
op_
01
US
31.
50"
800
mm
9.0
6"
1.58"
40mm
230
mm
9.0
6"
70mm
2.76"
26.78"
680mm
230
mm
Utility input
Output Load
Battery
Fig. 3.4.1-2 Opening on top of the cabinet for input and
cables of SG Series 10 & 20 kVA
SG
T5
00
0_
03
0-0
40
_U
PS
vie
w t
op
_0
1U
S
31.
50"
800
mm
13
.78
"
1.58"
40mm 110m
m
4.3
3"
70mm
2.76"
26.78"
680mm
Utility input
Output Load
Battery
350
mm
Fig. 3.4.1-3 Opening on top of the cabinet for input and
cables of
SG Series
30 & 40 kVA
SG
T5
00
0_0
30
-04
0_
UP
S v
iew
bo
tto
m_
01
US
Utility input
Output Load
26.78"
680mm
7.0
9"
18
0m
m
70mm
2.76"
50mm
1.97"
7.8
8"
20
0m
m
31
.50
"
800
mm
Fig. 3.4.1-4 Opening on the bottom of the cabinet for input and
output cables SG Series 10 - 20 - 30 - 40 kVA
SG Series openings are provided on the
top and the bottom of the UPS for the
connection of input and output cables.
Pay attention to the position of these
openings, when choosing the placement of
the UPS.
These openings are covered with a
protective plate.
Positioning of the UPS cabinet
SG Series is equipped with wheels for easy
placement of the UPS.
To make the UPS movable on wheels, the bolts
on each leg of the cabinet have to be turned
counter-clockwise, until they are free from the
floor and thus the cabinet supported on
wheels.
After having positioned the UPS at its final
location, the cabinet has to be secured by
rotating the bolts on each leg clockwise, but
the wheels must still touch the floor.
To lower
To lift
Fig. 3.4.1-4 Bolts for the regulation of the cabinet
The UPS cabinet is free
standing and normally does
not require to be bolted to the
floor.
The UPS cabinet can be fixed
however to the floor by bolting
it with the supporting blocks to
the floor.
The supporting blocks can be
used in different positions (0° -
360°)
These supporting blocks are
part of the shipping package.
See Fig. 3.4.1-5.
SGT5000_010-020_UPS
fixing_01
0 - 360°
Fig. 3.4.1-5 Fixing of the UPS cabinet on the floor
Modifications reserved
Page 14/45
OPM_SGS_ISG_10K_40K_0US_V040.doc
Installation Guide SG Series 10 –20 – 30 - 40 kVA