GE Industrial Solutions Spectra Series Fusible Switch Units H, K & R User Manual
Spectra series™ fusible switch units, Installing the expansion kit, 200 ampere expansion kit (h, k, and r fuses)
g
Spectra Series™ Fusible Switch Units
200 Ampere Expansion Kit (H, K, and R Fuses)
WARNING: Danger of electrical shock or injury.
Turn
OFF power ahead of the panelboard or
switchboard before working inside the
equipment or removing any component
.
Do
not remove circuit protective devices or any
other component until the power is turned
OFF.
Installing the Expansion Kit
1. Remove the switch. Loosen the rail latch screws and
remove the switch by pulling up on the latch handles
while pulling the device from the equipment, as
shown in Figure 1.
2. Prepare the enclosure. Remove and discard the
blank cover and the bottom insulator from the
bottom of the device, as shown in Figure 2.
3. Install the straps. Install the connecting straps with
the 10-32 x
1
/
2
" screws provided, as shown in Figure
3. Tighten the screws to 27–32 in-lb.
Figure 1. Removing the switch from the equipment.
Figure 2. Removing the blank cover and bottom insulator.
Figure 3. Installing the connecting straps.
GEH5889 Installation Instructions
R02
Rail Latch
Screw
Latch
Handle
Bottom
Insulator
Blank
Cover
Strap
#10-32
Screw